Pat came up first thing this morning and started hammering. Our goal was to get to a the point where we could add the first couple of glue lam beams to the structure. That mean getting all of the main level walls done and a start on the wing wall. The wing wall will support the canted portion of the master bedroom.
Tomorrow Eric and Pat will be back up late morning. Dave will swing by about the same time and the four of us will install the two main beams in the second floor framing.