The past few days we've been preparing for siding. We finished up most of the curved wall before Trevor had to switch over to his other summer job, T.D. for the summer theater program at Idyllwild Arts. We'll miss him but he'll be back in three weeks. Friday Dave stopped by with a little visitor he found on the way to his compost bin. When he released it (a rattlesnake) out in the forest he noted that it measured about 5 feet long. We found it strange that it never rattled. Over the weekend Bonnie, Eric, and I got the lower level landing, all of the interior steps and the entryway closet in place.
The step up to the main level started at about four feet wide at the landing and curve wide to about 6 feet at the top - Lots of custom cuts.
This is a shot taken from the crawl space toward the entryway landing.
No comments:
Post a Comment