front elevation of plans

Thursday, April 5, 2012

Over our Spring Break we got a bunch done on the house.  Just before break we passed our combo inspection which means we could insulate.  Within a week we insulated the entire addition and passed that inspection as well.  Next step drywall and knotty pine ceilings 

On the main level we got most of the drywall and pine up.  We asked a couple of carpenters who gave us a hand in the fall to help us out again with this next step in the process.


It wasn't all work.  Dave, Tom and I got out and did some snowshoeing one evening.  The snow was about 4 feet deep in most spots.
Upstairs we got a start on the drywall and a good part of the knotty pine up on the ceiling.   
It was great to make some serious progress on the house.  Once the weather stays consistently warm we are going to break through the wall of the existing house and make a doorway into the addition, we can't wait.  For the next two months this project is pretty much on hold as we are very busy with work.  Along with all of the other end of the year stuff we have two main-stage shows to produce before the end of the year.    