Dave was great, I wish I had taken a picture. He was roped in and swinging from the master bedroom dormer pulling shingles. Tomorrow we are hoping to start the build up on the existing roof.

front elevation of plans
Sunday, August 14, 2011
The focus has been the roof. The past couple of days Trevor and I have been sheeting the back portion of the existing roof. Yesterday progress was slowed because of the threat to T-storms.
After Trevor and I got the sheeting on in the morning, Dave and I finished the tear off in the afternoon.
Dave was great, I wish I had taken a picture. He was roped in and swinging from the master bedroom dormer pulling shingles. Tomorrow we are hoping to start the build up on the existing roof.
Dave was great, I wish I had taken a picture. He was roped in and swinging from the master bedroom dormer pulling shingles. Tomorrow we are hoping to start the build up on the existing roof.