front elevation of plans

Wednesday, August 3, 2011

More roof and deck

The past couple of days Eric and I have been working on the south side roof of the master bedroom.  After getting it framed up, we sheeted it.  The dormer will have a nice 2 foot by 5 foot window in the center. 

View from new master bedroom looking up toward the existing / old roof. Don't worry the shingles won't be the decor in the new master bedroom.
While Eric and I were up on the roof,  Bonnie was working hard on the deck.  She had the tedious task of adding blocks over the beams.  A step that needed to happen before we got too much farther on adding the redwood surface.


View from the street
From this angle you can see how the deck relates to the front of the house.  The deck will end about 12 feet from the leading edge of the addition.
The thing in the middle of the picture is the front end of our new boat.. we mean deck.  The picture was taken from the new front entry way.
We found this guy as we were off loading some of the roofing material.  We don't know how long he'll last around these parts as there are lots of predators that would enjoy eating him.

No comments:

Post a Comment